As a supplier of Hermetically Sealed Oil Filled Transformers, I understand the critical importance of proper installation to ensure the optimal performance and longevity of these essential electrical devices. In this blog post, I will share some key installation precautions that should be taken into account when installing a hermetically sealed oil filled transformer.
Site Selection
The first step in the installation process is to carefully select the installation site. The site should be well - drained to prevent water accumulation around the transformer, as water can cause corrosion and damage to the transformer's components. It should also be located away from sources of excessive heat, such as industrial furnaces or direct sunlight for long periods, as high temperatures can degrade the insulating oil and reduce the transformer's efficiency.
The area should have sufficient space around the transformer for maintenance and inspection. A clear distance of at least 1 - 2 meters should be maintained on all sides of the transformer to allow easy access for technicians. Additionally, the site should be free from any flammable materials, as oil - filled transformers contain a significant amount of insulating oil which is flammable.
Foundation Preparation
A solid and level foundation is crucial for the stable installation of a hermetically sealed oil filled transformer. The foundation should be able to support the weight of the transformer and any associated equipment. Concrete foundations are commonly used, and they should be designed and constructed according to the manufacturer's specifications.
Before pouring the concrete, it is important to ensure that the ground is properly compacted to prevent settlement. Reinforcing bars may be added to the concrete to increase its strength. After the foundation is poured, it should be allowed to cure for the recommended period of time before the transformer is installed.
Handling and Transportation
During the handling and transportation of the transformer, extreme care must be taken to avoid any damage. The transformer should be lifted using appropriate lifting equipment, such as cranes or forklifts, and the lifting points specified by the manufacturer should be used.
When transporting the transformer, it should be secured firmly to prevent movement. Special attention should be paid to protecting the transformer from vibrations, shocks, and impacts during transit. Any damage during handling or transportation can compromise the hermetic seal of the transformer and lead to oil leakage or other problems.
Electrical Connections
Proper electrical connections are essential for the safe and efficient operation of the transformer. All electrical connections, including the primary and secondary windings, should be made in accordance with the electrical codes and the manufacturer's instructions.
The conductors used for the connections should have the appropriate cross - sectional area to carry the rated current of the transformer. The connections should be tight and free from any loose or corroded parts. Before making the connections, the surfaces of the conductors and the terminals should be cleaned to ensure good electrical contact.
Oil Filling
The insulating oil used in a hermetically sealed oil filled transformer plays a vital role in insulation and cooling. Before filling the transformer with oil, the oil should be thoroughly tested to ensure its quality. The oil should meet the relevant standards for dielectric strength, moisture content, and other properties.
The oil filling process should be carried out in a clean and dry environment to prevent contamination. The oil should be filled slowly to allow any air bubbles to escape. After filling, the oil level should be checked and adjusted to the appropriate level as specified by the manufacturer.
Sealing and Testing
Once the transformer is installed and the oil is filled, the hermetic seal of the transformer should be checked to ensure its integrity. Any seals or gaskets should be inspected for proper installation and tightness.
After the installation is complete, a series of tests should be conducted on the transformer. These tests may include insulation resistance tests, turns ratio tests, and no - load and full - load tests. These tests help to verify the electrical performance of the transformer and ensure that it is operating within the specified parameters.
Protection and Monitoring
To ensure the long - term reliability of the transformer, appropriate protection and monitoring systems should be installed. Over - current protection devices, such as fuses or circuit breakers, should be installed to protect the transformer from excessive current.
Temperature sensors can be installed to monitor the temperature of the transformer windings and the oil. High - temperature alarms can be set up to alert operators in case of abnormal temperature rises. Additionally, oil level sensors can be used to monitor the oil level in the transformer.
Maintenance Planning
Even after a successful installation, regular maintenance is essential for the continued operation of the hermetically sealed oil filled transformer. A maintenance plan should be developed based on the manufacturer's recommendations and the operating conditions of the transformer.
The maintenance plan may include tasks such as oil sampling and testing, visual inspections of the transformer components, and tightening of electrical connections. Regular maintenance helps to detect and address any potential problems before they become serious.


In conclusion, the installation of a hermetically sealed oil filled transformer requires careful planning and attention to detail. By following these installation precautions, you can ensure the safe, efficient, and reliable operation of the transformer. If you are in the market for a high - quality Hermetically Sealed Oil Filled Transformer, we are here to provide you with the best products and professional advice. We also offer 11kv Distribution Transformer and 1000 Kva Oil Filled Transformer to meet your diverse needs. If you have any questions or are interested in purchasing our transformers, please feel free to contact us for further discussion and negotiation.
References
- Electrical Power Systems Design and Analysis Handbook
- Standards for Oil - Filled Transformers by International Electrotechnical Commission (IEC)
- Manufacturer's Installation and Operation Manuals for Hermetically Sealed Oil Filled Transformers