Year-end Routine
 

The final page of the year is about to turn. Here at VKE Transformer, that rhythm isn't slowing - it's the familiar sight of orderly, focused work continuing as normal. For us, this period has never been the finish line; it is a crucial time to build production capacity and prepare for new orders in the coming year.

Raw Material Foundation
 

The warehouse is the first stop. On the shelves, rolls of electromagnetic wire, various insulation components, fastening clamps, and other accessories are all clearly categorized and neatly stored. The order here is the guarantee for the smooth operation of the production line. Sufficient reserves of parts and components mean that we are always ready to respond to diverse production demands.

VKE Transformer Warehouse
Copper Foil for Transformers
Manufacturing Processes
 

coil winding

 

In the coil winding workshop, our CNC winding machines operate with precision to carefully form each turn of the coil. This step is fundamental to transformer manufacturing, as it directly determines the product's ability to deliver stable, reliable performance over many years of operation.

Coil Winding

core assembly

 

In the core assembly area, workers are layering and pressing silicon steel sheets. This stage demands extremely high standards for flatness and compactness - the precise stacking of every single sheet influences the energy efficiency of the final product.

Core Assembly

Dry-Type Production Line

 

 

Transformer Curing Treatment

In the curing area, windings are undergoing programmed curing treatment.

Transformer Assembly

In the assembly workshop, the cured windings are precisely matched with supporting structures.

Transformer Final Assembly

In the final assembly area, the connection of leads and the installation of the heat dissipation system are completed.

Diverse Manufacturing

 

 

In the substation production area, workers are assembling dry type transformer units with matching components. Meanwhile, in the switchgear assembly area, the wiring of primary and secondary circuits, along with the installation of various electrical components, is proceeding in an orderly manner.  

 

Substation European-style
Switchgear

Getting Ready for What's Next

 

 

The busy year-end is about the year ahead. We're delivering current orders, and preparing well for what next year brings - its challenges and its opportunities. As the New Year approaches, VKE Transformer's production lines will continue to maintain this efficiency and rigor. We deeply understand that the cornerstone of customer trust is built into every ordinary day and engraved in every meticulously manufactured product.