This series strictly complies with national standards and boasts advantages including reliability, high efficiency, environmental friendliness, and minimal maintenance. They are ideal choices for industrial and commercial power systems.

Specification
|
Model |
Quantity |
Accessories |
|
SCB11-630/10/0.4 |
2 |
Cooling Fans, Temperature Controller with RS485 Interface, Stainless Steel Enclosure 1700 x 1400 x 2200 mm, Bottom Protective Grille, Electromagnetic Locks, Dual Limit Switches |
|
SCB11-800/10/0.4 |
2 |
Cooling Fans, Temperature Controller with RS485 Interface, Stainless Steel Enclosure 1800 x 1400 x 2200 mm, Bottom Protective Grille, Electromagnetic Locks, Dual Limit Switches |
|
SCB11-1000/10/0.4 |
1 |
Cooling Fans, Temperature Controller with RS485 Interface, Stainless Steel Enclosure 1800 x 1500 x 2200 mm, Bottom Protective Grille, Electromagnetic Locks, Dual Limit Switches |
|
SCB11-1250/10/0.4 |
4 |
Cooling Fans, Temperature Controller with RS485 Interface, Stainless Steel Enclosure 1900 x 1500 x 2200 mm, Bottom Protective Grille, Electromagnetic Locks, Dual Limit Switches |
Manufacturing

01
Material Preparation
*Perform electromagnetic calculations and structural design based on technical requirements.
*Prepare core materials, including silicon steel sheets, enameled wires, insulating materials, bobbins, and enclosures.

02
Core Processing
*Slitting: Cut silicon steel coils into strips according to design specifications.
*Stacking: Laminate silicon steel sheets crosswise to form a core of specified shape and size, in order to reduce eddy current loss.

03
Coil Winding
*Winding: Wind enameled wires tightly onto the bobbin using a winding machine according to specified turns and layers.
*Lead attachment: Solder winding leads to terminals, and ensure proper insulation and securing.

04
Insulation & Assembly
*Treatment: Wrap finished coils with insulating paper, tape, etc., to ensure sufficient insulation strength.
*Assembly: Insert coils into the core and fasten them to form a complete transformer unit.

05
Vacuum Impregnation
*Pre-drying: Place the assembled transformer units in an oven to remove moisture.
*Impregnation: Put the units into a varnish tank, evacuate the air, and then inject insulating varnish.
*Curing: Remove the units and bake at high temperature to cure the varnish.

06
Final Assembly & Wiring
*Install the impregnated and cured units into enclosures.
*Weld input/output terminals, and install auxiliary components such as fuses and indicator lights.

07
Testing
Turns Ratio Test
Dielectric Withstand Test
Resistance Test
No-Load Losses Test
Load Losses Test

08
Final Inspection & Packaging
Appearance Inspection: Check for scratches, stains, and correct labeling.
Performance Sampling Test: Conduct key electrical tests again.
Packaging: Use shock-absorbent and moisture-proof materials to ensure safe transportation.
Promise
As the truck departs, we are thinking not only completing an order, but also honoring the trust the customer has placed in us for the years to come. When you buy from us, you get more than a transformer; you get our promise to be there when you need us. We're here to make things reliable and easy for you.